Modification of Milling and Turning Tool Inserts Plant Layout in a Tool Manufacturing Company

Authors

  • Bopanna K D  Assistant Professor, Department of Mechanical Engineering, NHCE, Bangalore
  • M S Ganesha Prasad  Dean, Professor & HOD-ME, NHCE, Bangalore

Keywords:

Value Stream Mapping, Lead Time, WIP Inventory, Flow Line

Abstract

This work is pertaining to modification of milling and cutting tool inserts plant layout in Production Unit.. Extensive work has been carried out using value stream mapping (VSM) to identify the problems, bottlenecks, cycle time, down time, work-in-process inventory, material movement constraints, production flow lines etc in the existing system. Modification of present layout in PU5 leading to creation of separate layout for five operations of milling inserts manufacturing activity, addition of machines required, and reducing the job allocation time from 24 hours to 6 hours has resulted in a lot of improvements. Significant improvements are; 

  • Lead time of milling inserts manufacturing is reduced from 14.092 days to 5.95 days and that of turning inserts is reduced from 12.392 days to 5.58 days. Percentage reduction in Lead time is 57.77% and 54.97% respectively. 
  • Work-in-process Inventory is reduced from 210550 units to 110600 units, reduction of 47.5 percent. 
  • Material handling distance is reduced from 315 meters to 265 meters. Value added percent for Turning Inserts is increased from 15.04 % to 45.02% and for milling inserts from 13.012 % to 42.02%.

(iv) Centralization of coolant supply system resulted better space utilization and flexibility in effecting changes in machines locations. 

(v) With the new overhead electric connections, the power line can be dropped down and used by the required machines and the need to re-wire and re-do the entire electric connection for layout changes is eliminated.

Based on the study and in consultation with company executives the present Mixed-flow line is converted into Mixed-flow line zone To Parallel dedicated flow lines zone To Mixed-flow line zone in two plants.This resulted in development of separate reconfigured layout.

References

[1] Muther R. Systematci Layout Planning. Cohners Publishing Company, 1973.

[2] Heragu SS. Facilities Design. CRC Press Taylor & Francis Group, 2008.

[3] Djassemi M. Improving Factory Layout under a Mixed Floor and Overhead Material Handling Condition. Journal of Manufacturing Technology Management 2007; 18(3):281-291.

[4] Tompkins W, Bozer & Tanchoco. Facilities Planning. John Wiley & Sons, Inc., 2010.

[5] Chien TK. An Empirical Study of Facility Layout Using a Modified SLP Procedure. Journal of Manufacturing Technology Management 2004;15(6):455-465.

[6] Hassan MMD. Toward Guiding the Selection of a Layout Procedure. Journal of Manufacturing Technology Management 2007;18(3):292-303.

 [7] Ermin Z, Kelou C, Yanrong Z. Overall Layout Design of Iron and Steel Plants Based on SLP Theory. IFIP International Federation for Information Processing 2010;345:139-147.

[8] Wiyaratn W, Watanapa A, Kajondecha P. Improvement Plant Layout Based on Systematic Layout Planning. IACSIT International Journal of Engineering and Technology 2013;5.

 [9] Foulds LR, Gibbons PB, Giffin JW. Facilities Layout Adjacency Determination: An Experimental Comparison of Three Graph Theoretic Heuristics. Operations Research 1985:1091-1106.

[10] Leung J. A New Graph-Theoretic Heuristic for Facility Layout. Management Science 1992;38:4.

[11] Entezari A. Facilities Planning. Tehran: Jahan Jame Jam, (Farsi Text Book) 2005.

 [12] Tompkins JA, White JA, Bozer YA, Tanchoco JMA. Facilities Planning. Fourth Edition. John Wiley & Sons, Inc. 2005.

Downloads

Published

2019-12-30

Issue

Section

Research Articles

How to Cite

[1]
Bopanna K D, M S Ganesha Prasad, " Modification of Milling and Turning Tool Inserts Plant Layout in a Tool Manufacturing Company" International Journal of Scientific Research in Computer Science, Engineering and Information Technology(IJSRCSEIT), ISSN : 2456-3307, Volume 4, Issue 9, pp.879-884, November-December-2019.